Waterwatch Data Portal
Site visit details
Overview
Catchment | Mallee |
---|---|
Site | Cowanna Bend Billabong MA_BYE350 |
Date and Time | Monday 5th October 2015 11:00am |
Approved | Approved |
Physical Chemical Tests
D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|
Sample | 1634 | 6.8 | 0.01 | 23.2 | 0 |
Weather | sunny |
---|---|
Last rainfall | More than a week ago |
Flow estimate | PERMANENT: wetlands and lakes |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Pumping into Cowanna billabong stopped 2 days ago. Pumping has just resumed after sample was taken. Turbidity: Water column crystal clear in tube
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au