Waterwatch Data Portal
EG_NIC060 Nicholson River - 500m upstream of backwater at surface
17 November 2015
Site visit details
Overview
Catchment | Nicholson River |
---|---|
Site | Nicholson River - 500m upstream of backwater at surface EG_NIC060 |
Date and Time | Tuesday 17th November 2015 10:20am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Secchi m | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 117.8 | 81840 | 7.1 | 0.02 | 24.5 | 21 | 10 |
Weather | overcast |
---|---|
Last rainfall | More than a week ago 20 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | 3.3 |
Stream width | |
Hazards | |
Litter/Pollutants |
5 knot north wind
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au