Waterwatch Data Portal
EG_FOR030 Forge Creek, rock chute - Site 1
20 November 2015
Site visit details
Overview
Catchment | Lake Victoria |
---|---|
Site | Forge Creek, rock chute - Site 1 EG_FOR030 |
Date and Time | Friday 20th November 2015 09:17am |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 203 | 6.7 | 0.01 | 21.2 | 19.4 | 11 |
Weather | cloudy |
---|---|
Last rainfall | During the last week 2.8 |
Flow estimate | POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected) |
Water Appearance | Stained brown,Other: Algal growth |
Stream depth | 1m - 2m |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au