Site visit details

Overview

Catchment Bunyip River
Site Bittern Dam, near dam wall and catch drain ME_EBI100
Date and Time Thursday 26th November 2015 11:06am
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 7 1415 0 8.2 0 17 20.5 9
Weather sunny
Last rainfall Raining Now
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth 0 - 50cm
Stream width >5m
Hazards
Litter/Pollutants cans
workmen on site .access road has been altered. over flow from reservoir has been altered.lots of water birds

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au