Site visit details

Overview

Catchment Goulburn River
Site Lake Bartlett near culvert at South End GB_LBT006
Date and Time Monday 22nd June 2015 12:30pm
Approved Approved

Notes

Physical Chemical Tests

Chem mg/L D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Water ° C P mg/L Turb NTU
Sample 61 6.8 667 7.3 0.03 9.2 21
Weather cloudy
Last rainfall 0
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
water level high cold cloudy day with a cold breeze

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au