Waterwatch Data Portal
GB_LBT006 Lake Bartlett near culvert at South End
22 June 2015
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Lake Bartlett near culvert at South End GB_LBT006 |
Date and Time | Monday 22nd June 2015 12:30pm |
Approved | Approved |
Physical Chemical Tests
Chem mg/L | D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 61 | 6.8 | 667 | 7.3 | 0.03 | 9.2 | 21 |
Weather | cloudy |
---|---|
Last rainfall | 0 |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
water level high cold cloudy day with a cold breeze
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au