Waterwatch Data Portal
GB_LBT006 Lake Bartlett near culvert at South End
27 July 2015
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Lake Bartlett near culvert at South End GB_LBT006 |
Date and Time | Monday 27th July 2015 11:20am |
Approved | Approved |
Physical Chemical Tests
Chem mg/L | D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 79 | 8.8 | 627 | 7.3 | 0.01 | 9 | 38 |
Weather | sunny |
---|---|
Last rainfall | 0 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
sunny, frosty day water level medium
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au