Waterwatch Data Portal
GB_WCP003 Cussen Park Site 3 - Weir Wall, downstream
27 July 2015
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Cussen Park Site 3 - Weir Wall, downstream GB_WCP003 |
Date and Time | Monday 27th July 2015 12:10pm |
Approved | Approved |
Physical Chemical Tests
Chem mg/L | D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | Rain mm | rP mg/L P | Air ° C | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 46 | 5.1 | 129 | 7 | 0.04 | 9.2 | 27 |
Weather | overcast |
---|---|
Last rainfall | 0 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
overcast, cold, windy day water level medium wattles flowering
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au