Site visit details

Overview

Catchment Goulburn River
Site Mid point of bioremediation basin - Gemmills Swamp GB_WGS002
Date and Time Monday 23rd November 2015 11:10am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Water ° C Turb NTU
Sample 52 4.5 115 6.8 0.24 21.8 21
Weather sunny
Last rainfall 0
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
sunny, windy day water level low

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au