Waterwatch Data Portal
GB_WGS002 Mid point of bioremediation basin - Gemmills Swamp
21 December 2015
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Mid point of bioremediation basin - Gemmills Swamp GB_WGS002 |
Date and Time | Monday 21st December 2015 10:00am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 55 | 4.7 | 198 | 6.5 | 0.61 | 21.8 | 31 |
Weather | windy |
---|---|
Last rainfall | 0 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
warm and windy very hot over the last weekend water level low water tea coloured
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au