Site visit details

Overview

Catchment Broken River
Site Amaroo Lake at letterbox pit GB_LKL004
Date and Time Monday 21st December 2015 12:45pm
Approved Approved

Notes

Physical Chemical Tests

Chem mg/L D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm rP mg/L P Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 2 74 5.9 153 7.8 0.04 25.2 0.05 92
Weather windy
Last rainfall 0
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
warm and windy very hot over the last weekend

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au