Site visit details

Overview

Catchment Ovens River
Site Barwidgee Creek, DePiazza Lane, Mudgegonga LCG Site 4 NE_BAR045
Date and Time Friday 11th March 2016 14:15pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm Nitrate-Nit mg/L N pH pH Units rP mg/L P Water ° C Turb NTU
Sample 52.8 3.95 190 7.2 0.088 22.9 10
Weather cloudy
Last rainfall
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth
Stream width
Hazards
Litter/Pollutants other
Hello, Same as usual. Kept the O2 meter probe damp all month and it calibrated fairly well. checked it each week and added some de-ionised water once. Flow is getting lower. I guessed 10-20 litres per minute. On the good side, the siltation has slowed. Cheers, Terry

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au