Waterwatch Data Portal
ME_YYD808 Chelsworth Input (stormwater capture draining to Reedy Billabong)
18 March 2016
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Chelsworth Input (stormwater capture draining to Reedy Billabong) ME_YYD808 |
Date and Time | Friday 18th March 2016 09:30am |
Approved | Approved |
Physical Chemical Tests
No physical chemical tests recorded on this visit
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample |
Weather | raining |
---|---|
Last rainfall | Raining Now 10 |
Flow estimate | BANKFULL: High flow within channel capacity and in-stream habitats connected |
Water Appearance | Clear,Other: slightly milky |
Stream depth | 51cm - 99cm |
Stream width | 5 |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au