Site visit details

Overview

Catchment Maribyrnong River
Site Tributary of Deep Creek @ Newham Primary School ME_MDT010
Date and Time Wednesday 11th May 2016 09:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.1 36.3166 4 370 7 0.03 8.2 11 35
Weather overcast
Last rainfall During the last week 46
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth 1m - 2m
Stream width
Hazards
Litter/Pollutants

DO estimated as the syringe is broken

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au