Site visit details

Overview

Catchment Ovens River
Site Barwidgee Creek, DePiazza Lane, Mudgegonga LCG Site 4 NE_BAR045
Date and Time Tuesday 17th May 2016 09:02am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm Nitrate-Nit mg/L N pH pH Units rP mg/L P Water ° C Turb NTU
Sample 66 6.45 220 7.3 0.052 13 10
Weather overcast
Last rainfall
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth
Stream width
Hazards
Litter/Pollutants
Hi Vanessa, Thanks for dinner last Friday, hope you had a good time. We did. We talked a bit about other sites to measure. Is there anything on the way to Myrtleford, possibly Myrtle Creek on the Stanley Rd junction with Barwidgee Creek? The flow has recovered following the rains. Keeping the DO analyzer damp and cool has worked. It calibrated better than ever this morning. I even put it in the freezer for a few minutes while calibrating the other meters. My guess is the lower temperature will reduce the drying of the membrane. Is this my last submission to you? Or will you be around till end of June? Cheers, Terry

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au