Site visit details

Overview

Catchment Goulburn River
Site Mid point of bioremediation basin - Gemmills Swamp GB_WGS002
Date and Time Tuesday 24th May 2016 09:10am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Water ° C Turb NTU
Sample 15 1.6 86 6.7 11.7 6
Weather sunny
Last rainfall
Flow estimate PERMANENT: wetlands and lakes
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
sunny, cool day reactive ph no longer tested at this site water level medium/high fuller than in past months lots of birds calling

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au