Site visit details

Overview

Catchment Goulburn River
Site Lake Bartlett - Goulburn Murray Water Drain GB_LBT001
Date and Time Tuesday 24th May 2016 10:15am
Approved Approved

Notes

Physical Chemical Tests

Chem mg/L D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm rP mg/L P Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 26 53 5.6 32 309 6.9 12.2 2420 0.11 90
Weather sunny
Last rainfall
Flow estimate PERMANENT: wetlands and lakes
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
sunny, cool day reactive phosphorus is no longer being tested at this site water level medium/high

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au