Waterwatch Data Portal
NC_BIR500 Birch Creek @ Mullers Lane, Smeaton
12 July 2016
Site visit details
Overview
Catchment | Loddon River |
---|---|
Site | Birch Creek @ Mullers Lane, Smeaton NC_BIR500 |
Date and Time | Tuesday 12th July 2016 16:00pm |
Approved | Approved |
Physical Chemical Tests
D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 0 | 400 | 6 | 0.05 | 6.1 | 7.4 | 40 |
Weather | windy |
---|---|
Last rainfall | During the last week 25 |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | Stained brown |
Stream depth | >2m |
Stream width | >5m |
Hazards | |
Litter/Pollutants |
Drains and gutters are now flowing into the creek now that ground is fully saturated. Colour of water not alarming only associated with run off from paddocks. On Friday Newlyn Reservoir had an inflow of 100 megs per 24 hrs, here the creek is doing the same if not more. Local farmers say this year is the wettest start to winter for the past 30 yrs. Cyberscan DO not operational.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au