Site visit details

Overview

Catchment Bunyip River
Site Devilbend Reservoir, western tip, accessible by 2wd track ME_EDV300
Date and Time Wednesday 15th June 2016 10:45am
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 10 944 0 7.5 0 12 11.7 9
Weather sunny
Last rainfall During the last week 5
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth 0 - 50cm
Stream width >5m
Hazards muddy on banks
Litter/Pollutants
no litter or rubbish less weed in water

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au